BC Hydro’s customer is building the large, phased Martini Film Studio (MFS) development at 216th street and 80th avenue with expected load of 12MW. To supply the customer with 12 MW of clean and renewable electricity, BC Hydro will construct a new circuit extension from the existing Fleetwood substation. This will require pulling approximately 8 km of new cable (i.e., powerline) from Fleetwood sub

Project Information FAQ

Project Information

5 Q
The project "BC Hydro - Customer Connection Project: Martini Film Studios Electrification" is an infrastructure initiative in the Hydro, Power Generation (CCGT), Road, Commercial sector, located in N/A, Canada. Taiyo aggregates data from Infrastructure Canada, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

BC Hydro’s customer is building the large, phased Martini Film Studio (MFS) development at 216th street and 80th avenue with expected load of 12MW. To supply the customer with 12 MW of clean and renewable electricity, BC Hydro will construct a new circuit extension from the existing Fleetwood substation. This will require pulling approximately 8 km of new cable (i.e., powerline) from Fleetwood substation in Surrey to 176th St and 64th Ave. Project works include: • Extend approximately 3 km of feeder cable through new duct bank along 152 Street from 72 Avenue to 64 Avenue; • Extend approximately 5km of feeder cable along 64 Avenue from 152 to 176 • Install approximately 850 m of feeder cable from Fraser Highway to 200 Street along Production Way; • Upgrade approximately1.63 km of feeder cable • Install approximately1 km of UD cable between 10 junction boxes; and • Install one 5-way automated vista. Electrical (Overhead) • Install approximately 3 overhead switches; • Install approximately 3 terminal poles; • Approximately 760 m double circuit along Glover Road to 64 Avenue. • Install approximately 800 m of new 12-way duct bank along 64 Avenue from 172 to 176 Street, connect to existing duct bank; • Install approximately 850 m of 16-way duct bank from Fraser Highway to 200 Street along Production Way; • Install approximately 10 junction boxes onsite for UD backbone; • Install civil for onsite above ground 5-way automated vista; and, • All related works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data