logo
ProjectIn Progress

BC Hydro Customer Connection Project: ARC Resources Electrification

In progress · British Columbia

Source: Infrastructure Canada

The BC Hydro Customer Connection Project: ARC Resources Electrification (the project) includes the construction of one tap for the Attachie project, and the installation of a fourth transformer within BC Hydro’s Bear Mountain Terminal substation to supply the Dawson facility. A tap is the electrical connection point between the customer’s transmission line and BC Hydro’s electricity grid. The tap

Status
Under Construction
Sector
Cement, Steel, Hydro, Natural Gas, Power Generation (CCGT), Road, Metal, Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about BC Hydro Customer Connection Project: ARC Resources Electrification

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “BC Hydro Customer Connection Project: ARC Resources Electrification” is an infrastructure initiative in the Cement sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The BC Hydro Customer Connection Project: ARC Resources Electrification (the project) includes the construction of one tap for the Attachie project, and the installation of a fourth transformer within BC Hydro’s Bear Mountain Terminal substation to supply the Dawson facility. A tap is the electrical connection point between the customer’s transmission line and BC Hydro’s electricity grid. The tap and transformer are required to supply electricity to the Attachie and Dawson natural gas processing facilities, respectively. Project works for the tap: • Construction of a 138 kilovolt tap on a BC Hydro transmission line. Work includes the following: o a single-pole vertical dead-end tap structure is proposed for connection to transmission line 1L364 o three sectionalizing switches will be installed at the tap o modifications will be required to a couple of existing BC Hydro structures and new structures will be installed o key activities for tap construction include the following: right-of-way clearing for new structures, road access to tap structures, reclamation following project completion of the tap Project works for the transformer: • Installation of a fourth 230 kilovolt:138 kilovolt stepdown transformer at the Bear Mountain Terminal substation • Work will be undertaken within the fenced yard of the substation and includes the following: o purchase and installation of a transformer o excavation and construction for a new concrete foundation for the transformer o design, supply and installation of structural steel supports for the transformer bus connections (a bus is an electrical connection between two points)

Original sector

Green Energy

Budget

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Steel, Hydro, Natural Gas, Power Generation (CCGT), Road, Metal, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project