ProjectCompleted

BC Hydro Customer Connection Project: Barkerville Gold Mines Electrification

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The BC Hydro Customer Connection Project: Barkerville Gold Mines Electrification (the project) is building a new underground gold mine and processing plant in Wells, British Columbia with an expected operations date of 2024. The customer is seeking to fully electrify all underground mine equipment, making this one of the first truly underground electric mines in Canada. To connect to BC Hydro’s el

Status
Closed
Sector
Hydro, Commercial, Power Generation (CCGT), Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about BC Hydro Customer Connection Project: Barkerville Gold Mines Electrification

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “BC Hydro Customer Connection Project: Barkerville Gold Mines Electrification” is an infrastructure initiative in the Hydro sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The BC Hydro Customer Connection Project: Barkerville Gold Mines Electrification (the project) is building a new underground gold mine and processing plant in Wells, British Columbia with an expected operations date of 2024. The customer is seeking to fully electrify all underground mine equipment, making this one of the first truly underground electric mines in Canada. To connect to BC Hydro’s electricity grid, a line position will be added to BC Hydro’s Barlow substation outside of the City of Quesnel in the central interior of B.C. This includes: • Conceptual design, detailed engineering and project planning; • Installation of one 66 kilovolt line position at Barlow substation, with associated protection and control equipment, to connect the customer’s transmission line; • Addition of one circuit breaker and associated disconnect switches; • Removal of temporary bus structure; • Installation of revenue metering equipment at the customer’s substation; and, • Protection review, upgrades, and changes at the Barlow substation.

Original sector

Green Energy

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Hydro, Commercial, Power Generation (CCGT), Government

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project