BC Hydro Customer Connection Project: Barkerville Gold Mines Electrification
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The BC Hydro Customer Connection Project: Barkerville Gold Mines Electrification (the project) is building a new underground gold mine and processing plant in Wells, British Columbia with an expected operations date of 2024. The customer is seeking to fully electrify all underground mine equipment, making this one of the first truly underground electric mines in Canada. To connect to BC Hydro’s el
- Status
- Closed
- Sector
- Hydro, Commercial, Power Generation (CCGT), Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about BC Hydro Customer Connection Project: Barkerville Gold Mines Electrification
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The BC Hydro Customer Connection Project: Barkerville Gold Mines Electrification (the project) is building a new underground gold mine and processing plant in Wells, British Columbia with an expected operations date of 2024. The customer is seeking to fully electrify all underground mine equipment, making this one of the first truly underground electric mines in Canada. To connect to BC Hydro’s electricity grid, a line position will be added to BC Hydro’s Barlow substation outside of the City of Quesnel in the central interior of B.C. This includes: Conceptual design, detailed engineering and project planning; Installation of one 66 kilovolt line position at Barlow substation, with associated protection and control equipment, to connect the customer’s transmission line; Addition of one circuit breaker and associated disconnect switches; Removal of temporary bus structure; Installation of revenue metering equipment at the customer’s substation; and, Protection review, upgrades, and changes at the Barlow substation. |
Original sector | Green Energy |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hydro, Commercial, Power Generation (CCGT), Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent