logo

BC Hydro Customer Connection Project: Capilano University Electrification

Sector: Hydro • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

Capilano University has requested to extend service capabilities to the primary service at their North Vancouver campus located at 2055 Purcell Way. The increase in load from 1.4 MW to 4.2 MW over the next 10 years will result in the need to Extend new underground feeder from Lynn Valley substation to the project site. The conceptual level scope consists of constructing approximately 1.3 km of 6-w

Status
Prospective
Sector
Hydro, Education, Road
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about BC Hydro Customer Connection Project: Capilano University Electrification

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “BC Hydro Customer Connection Project: Capilano University Electrification” is an infrastructure initiative in the Hydro sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Capilano University has requested to extend service capabilities to the primary service at their North Vancouver campus located at 2055 Purcell Way. The increase in load from 1.4 MW to 4.2 MW over the next 10 years will result in the need to Extend new underground feeder from Lynn Valley substation to the project site. The conceptual level scope consists of constructing approximately 1.3 km of 6-way feeder duct bank along Fern Street, Lillooet Road and Purcell Way. Existing duct bank on Mountain Highway and Keith Road is planned to be utilized. The Project consists of the following physical works: - construction of an approx. 260 m 6-125 feeder duct bank on Fern Street (Mountain Hwy to Lillooet Road) - construction of an approx. 750 m 6-125 feeder duct bank on Lillooet Road (Fern St to Purcell Way) - construction of an approx. 325 m 6-125 feeder duct bank on Purcell Way (Lillooet Rd to 2055 Purcell Way) - installation of an approx. 5km underground feeder cable (LYN substation to 2055 Purcell Way) - installation of approx. 1 automated Vista switch and civil on-site, location to be determined by customer and all related works.

Original sector

Green Energy

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Hydro, Education, Road

Article published date

2026-06-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project