In Progress

BC Hydro’s customer, Crew Energy Inc. (“Crew Energy”), is electrifying an existing gas processing facility, West Septimus, and a proposed new gas processing facility, Groundbirch, in the Peace Region of British Columbia (B.C.) with an expected operations date of 2024 and 2026 respectively. The project will allow for the conversion of existing natural gas drives at the West Septimus facility to ele

Project Information FAQ

Project Information

4 Q
The project “BC Hydro Customer Connection Project: Crew West Septimus and Groundbirch Electrification” is an infrastructure initiative in the Natural Gas sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

BC Hydro’s customer, Crew Energy Inc. (“Crew Energy”), is electrifying an existing gas processing facility, West Septimus, and a proposed new gas processing facility, Groundbirch, in the Peace Region of British Columbia (B.C.) with an expected operations date of 2024 and 2026 respectively. The project will allow for the conversion of existing natural gas drives at the West Septimus facility to electric drives. Groundbirch is a proposed new natural gas processing plant that will be fully electric. To connect to BC Hydro’s electricity grid, the project will construct 2 kilometres of transmission line that will enable the connection of the two facilities to BC Hydro’s South Bank substation, south of Fort St. John in north-eastern B.C.. The customer requires 57.4 megawatts of electrical capacity to support both operations. BC Hydro will deliver the required capacity according to Crew Energy’s expected operations date for each facility: the first phase will deliver approximately 28.7 megawatts for West Septimus and the second phase will deliver approximately 28.7 megawatts for Groundbirch. This funding application covers both facilities. The project requires the construction of a line position within the South Bank substation in Fort St. John to connect the customer to the BC Hydro grid. This includes: - Feasibility & preliminary design, detailed engineering and project planning; - Construction of approx. 2 km of transmission line. - Installation of one 138 kilovolt line position at South Bank substation, with associated protection and control equipment, to connect the customer’s transmission line; - Addition of two circuit breakers and associated disconnect switches; - Installation of one revenue metering equipment at each of the customer’s facility substations; - Upgrades to protection and telecom for BC Hydro’s Peace Region system; - Protection review, upgrades, and changes at the South Bank substation; and, - All related works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data