logo

BC Hydro Customer Connection Project: Crew West Septimus and Groundbirch Electrification

Sector: Telecommunications • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

BC Hydro’s customer, Crew Energy Inc. (“Crew Energy”), is electrifying an existing gas processing facility, West Septimus, and a proposed new gas processing facility, Groundbirch, in the Peace Region of British Columbia (B.C.) with an expected operations date of 2024 and 2026 respectively. The project will allow for the conversion of existing natural gas drives at the West Septimus facility to ele

Status
Under Construction
Sector
Telecommunications, Power Generation (CCGT), Hydro, Natural Gas, Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about BC Hydro Customer Connection Project: Crew West Septimus and Groundbirch Electrification

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “BC Hydro Customer Connection Project: Crew West Septimus and Groundbirch Electrification” is an infrastructure initiative in the Telecommunications sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BC Hydro’s customer, Crew Energy Inc. (“Crew Energy”), is electrifying an existing gas processing facility, West Septimus, and a proposed new gas processing facility, Groundbirch, in the Peace Region of British Columbia (B.C.) with an expected operations date of 2024 and 2026 respectively. The project will allow for the conversion of existing natural gas drives at the West Septimus facility to electric drives. Groundbirch is a proposed new natural gas processing plant that will be fully electric. To connect to BC Hydro’s electricity grid, the project will construct 2 kilometres of transmission line that will enable the connection of the two facilities to BC Hydro’s South Bank substation, south of Fort St. John in north-eastern B.C.. The customer requires 57.4 megawatts of electrical capacity to support both operations. BC Hydro will deliver the required capacity according to Crew Energy’s expected operations date for each facility: the first phase will deliver approximately 28.7 megawatts for West Septimus and the second phase will deliver approximately 28.7 megawatts for Groundbirch. This funding application covers both facilities. The project requires the construction of a line position within the South Bank substation in Fort St. John to connect the customer to the BC Hydro grid. This includes: - Feasibility & preliminary design, detailed engineering and project planning; - Construction of approx. 2 km of transmission line. - Installation of one 138 kilovolt line position at South Bank substation, with associated protection and control equipment, to connect the customer’s transmission line; - Addition of two circuit breakers and associated disconnect switches; - Installation of one revenue metering equipment at each of the customer’s facility substations; - Upgrades to protection and telecom for BC Hydro’s Peace Region system; - Protection review, upgrades, and changes at the South Bank substation; and, - All related works.

Original sector

Green Energy

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Telecommunications, Power Generation (CCGT), Hydro, Natural Gas, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project