BC Hydro Customer Connection Project: KSM Mine Electrification - Phase 2

Sector: Power Generation (CCGT) • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

BC Hydro will construct a new switching station, Treaty Creek Terminal, to supply the KSM Mine with 245 megawatts (MW) of clean and renewable electricity - of which 25 MW will be used during the construction phase. Once construction of the switching station is complete, the customer will be able to connect to the grid for both the construction and operations. Typically the construction phase of a

Status
Under Construction
Sector
Power Generation (CCGT), Hydro
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about BC Hydro Customer Connection Project: KSM Mine Electrification - Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “BC Hydro Customer Connection Project: KSM Mine Electrification - Phase 2” is an infrastructure initiative in the Power Generation (CCGT) sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BC Hydro will construct a new switching station, Treaty Creek Terminal, to supply the KSM Mine with 245 megawatts (MW) of clean and renewable electricity - of which 25 MW will be used during the construction phase. Once construction of the switching station is complete, the customer will be able to connect to the grid for both the construction and operations. Typically the construction phase of a mine is powered by diesel generators. By using electricity versus fossil fuels during construction of the twin 23-kilometre-long access and ore haulage tunnels, it is expected to reduce GHG emissions by approximately 59,000 tCO2e and eliminate over 22.3 million litres of diesel fuel over the four-year construction period. During the mine production phase, the customer will electrify various components of the operation such as conveyors, crushers, air compressors, mobile equipment and underground ventilation systems. Electrification of these systems is expected to reduce emissions by about 43,300 tonnes CO2e on an annual basis. To supply the customer with 245 MW of clean, renewable electricity, Project works include: • Construction of a new switching station; and, • All related works.

Original sector

Green Energy

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro

Article published date

2026-06-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project