BC Hydro Customer Connection Project: KSM Mine Electrification - Phase 2

Sector: Hydro • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

BC Hydro will construct a new switching station, Treaty Creek Terminal, to supply the KSM Mine with 245 megawatts (MW) of clean and renewable electricity - of which 25 MW will be used during the construction phase. Once construction of the switching station is complete, the customer will be able to connect to the grid for both the construction and operations. Typically the construction phase of a

Project Information FAQ

Project Information

5 Q
The project “BC Hydro Customer Connection Project: KSM Mine Electrification - Phase 2” is an infrastructure initiative in the Hydro sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

BC Hydro will construct a new switching station, Treaty Creek Terminal, to supply the KSM Mine with 245 megawatts (MW) of clean and renewable electricity - of which 25 MW will be used during the construction phase. Once construction of the switching station is complete, the customer will be able to connect to the grid for both the construction and operations. Typically the construction phase of a mine is powered by diesel generators. By using electricity versus fossil fuels during construction of the twin 23-kilometre-long access and ore haulage tunnels, it is expected to reduce GHG emissions by approximately 59,000 tCO2e and eliminate over 22.3 million litres of diesel fuel over the four-year construction period. During the mine production phase, the customer will electrify various components of the operation such as conveyors, crushers, air compressors, mobile equipment and underground ventilation systems. Electrification of these systems is expected to reduce emissions by about 43,300 tonnes CO2e on an annual basis. To supply the customer with 245 MW of clean, renewable electricity, Project works include: • Construction of a new switching station; and, • All related works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data