logo

BC Hydro Customer Connection Project: St. Paul’s Hospital and Health Campus

Sector: Hydro • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

BC Hydro’s customer, Providence Health Care, is building the new St. Paul’s Hospital and Health Campus in Vancouver, British Columbia. Construction on the hospital commenced in spring 2021; it’s anticipated the new hospital will open to patients in 2027. The new St Paul’s Hospital and Health Campus will include 548 acute care beds and primary care services along with other specialty healthcare ser

Status
Closed
Sector
Hydro, Hospital, Residential, Power Generation (CCGT), Commercial, Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about BC Hydro Customer Connection Project: St. Paul’s Hospital and Health Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “BC Hydro Customer Connection Project: St. Paul’s Hospital and Health Campus” is an infrastructure initiative in the Hydro sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BC Hydro’s customer, Providence Health Care, is building the new St. Paul’s Hospital and Health Campus in Vancouver, British Columbia. Construction on the hospital commenced in spring 2021; it’s anticipated the new hospital will open to patients in 2027. The new St Paul’s Hospital and Health Campus will include 548 acute care beds and primary care services along with other specialty healthcare services. The new St. Paul’s Hospital and Health Campus is located in a neighbourhood — False Creek Flats — that has a robust City of Vancouver plan for future development and transformation, including improved transportation access and vehicle traffic by eliminating the Georgia and Dunsmuir viaducts. The City of Vancouver expects the number of jobs in the area will grow from 8,000 to 30,000 over the next 30 years. The BC Hydro Customer Connection Project: St. Paul’s Hospital and Health Campus Electrification (the project) includes the design and construction of the necessary electrical infrastructure to enable electrification of nearly 80% of the hospital facility. This project will allow BC Hydro to supply St. Paul’s Hospital with 8.8 megawatts (MW) of clean and renewable electricity. In addition, the two circuits that will deliver electricity from BC Hydro’s Murrin substation to the hospital will have additional capacity to feed other residential and commercial customers in an area that is undergoing significant growth and transformation. The purpose of this project is to deliver the necessary electrical infrastructure to enable electrification of the new St. Paul’s Hospital and Health Campus. Specifically, the project scope includes the extension of two 12 kilovolt circuits from BC Hydro’s Murrin substation to serve the new hospital. At a high level, this includes: • Construction of approx. 840 m of underground duct bank; • Installation of three Vista switchgear; • Installation of approx. 2,000 m of underground electric feeder cable and, • All related works

Original sector

Green Energy

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Hydro, Hospital, Residential, Power Generation (CCGT), Commercial, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project