B.C. Hydro Transmission Line for LNG Project
Sector: LNG • Location: British Columbia, Canada
Source: EnergyNow
A new $6-billion transmission line by B.C. Hydro to supply electricity equivalent to half the output of B.C. Hydro's Site C dam to the proposed Ksi Lisims LNG project by 2030. The transmission line project is on Canada's fast-track project list to accelerate economic growth and reduce dependence on the U.S.
- Status
- Prospective
- Sector
- LNG, Power Generation (CCGT), Natural Gas, Hydro
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- EnergyNow
ConstructChat
Ask ConstructChat about B.C. Hydro Transmission Line for LNG Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A new $6-billion transmission line by B.C. Hydro to supply electricity equivalent to half the output of B.C. Hydro's Site C dam to the proposed Ksi Lisims LNG project by 2030. The transmission line project is on Canada's fast-track project list to accelerate economic growth and reduce dependence on the U.S. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | British Columbia |
Source
Source | EnergyNow |
URL |
More Details
Record type | Project |
Sector | LNG, Power Generation (CCGT), Natural Gas, Hydro |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
