BCS Central Office Relocations
Sector: Power Generation (CCGT) • Location: Birmingham, Alabama, United States of America
Source: Dodge
Interior Renovations to a 166,000 square feet 12-story office building located in Birmingham, Alabama. Renovations include space reconfiguration, finish replacement, mechanical system upgrades, electrical system upgrades, and IT system upgrades. The building includes office space on levels 1-2 and 7-12, with existing integrated parking on levels 3-6. The scope of renovations varies on each floor.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Car parking, Automotive, Education, Residential, Government
- Location
- Birmingham, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about BCS Central Office Relocations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior Renovations to a 166,000 square feet 12-story office building located in Birmingham, Alabama. Renovations include space reconfiguration, finish replacement, mechanical system upgrades, electrical system upgrades, and IT system upgrades. The building includes office space on levels 1-2 and 7-12, with existing integrated parking on levels 3-6. The scope of renovations varies on each floor. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Birmingham |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Car parking, Automotive, Education, Residential, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
