Sector: Water Supply and Storage • Location: Russia

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

The proposed project will finance the development, construction and operation of two international standard warehouses in Moscow region. The proposed project will contribute to fulfilling the long term unmet demand for international standard warehousing and logistics facilities in Russia, and will introduce to the Russian market improved standards of warehouse construction management techniques. A

Project Information FAQ

Project Information

4 Q
The project “BD Logistics” is an infrastructure initiative in the Water Supply and Storage sector, located in Russia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project will finance the development, construction and operation of two international standard warehouses in Moscow region. The proposed project will contribute to fulfilling the long term unmet demand for international standard warehousing and logistics facilities in Russia, and will introduce to the Russian market improved standards of warehouse construction management techniques. A special purpose company will be registered in Russia which will be owned by ZAO Agrofirma Belaya Dacha Holding and the Bank. Equity investment of USD 4.3 million representing 34% of the Company’s equity. Senior Loan of USD 23.3 million structured as A/B Loan comprising Bank ‘A’ loan of USD 8.3 million and Participants (commercial banks) ‘B’ loan USD 15 million. The Bank’s total exposure will be in the region of 35% of total Project Costs. USD 35.9 million. Description of the proposed project The Bank will provide equity investment of USD 4.3 million representing 34% of the Company’s equity as well as Senior Loan of USD 23.3 million structured as A/B Loan comprising Bank ‘A’ loan of USD 8.3 million and Participants (commercial banks) ‘B’ loan USD 15 million. The proposed project will finance the development, construction and operation of two international standard warehouses in Moscow region. Screening categories and rationale for classification A large scale property development such as this project has specific environmental impacts which, however, can be readily identified and prevented through adequate measures and application of good international practice. For the above reasons, the EBRD has classified the project B/1, requiring an Environmental Analysis and Audit of the proposed site and associated facilities. Information reviewed during the environmental appraisal Soil and radiation test results on the adjunct area of the project site where the Sponsor already developed warehouse buildings as well as the completed Environmental Questionnaire have been reviewed by the Bank. An audit report and other relevant documents will be provided for the Bank’s review shortly as part of environmental due diligence. Environmental impacts and mitigation measures Early findings of the environmental due diligence confirm that the project has been structured in accordance with Russian environmental requirements and good international practice. A specific site audit is currently being conducted focusing on the following issues: (i) confirmation of compliance with environmental legal requirements; (ii) soil and ground water contamination analysis. An Environmental Action Plan (EAP) might be required if any significant shortcomings are identified during the due diligence. The company will be required to ensure that it complies with Russian and EU environmental, health and safety standards and requirements. To achieve that, the company will incorporate all necessary preventive and mitigation measures into the project design as well as commit itself to good international practice. Environmental opportunities The project will allow for urban regeneration through the utilisation of the brown-filed site. In addition, the project will use energy efficient materials and technology in operation of the warehouses. Monitoring The Bank will evaluate the project’s compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental reports (AER) prepared for the project covering: (1) on-going performance of project-specific environmental, health and safety programmes if applicable, and (ii) the status of implementation of environmental mitigation measures. Summary in Russian None. Website: http://www.belaya-dacha.ru

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data