Beach Boulevard (SR 212) from Southside Boulevard to Eve Drive Improvements
Sector: Commercial • Location: Florida, United States of America
Source: Florida Department of Transportation (FDOT)
The Florida Department of Transportation (FDOT) will host a construction open house for the Beach Boulevard (SR 212) from Southside Boulevard to Eve Drive improvements November 18 from 4-6 p.m. The in-person meeting will be held at the FDOT Urban Office Training Center located at 2198 Edison Avenue, Jacksonville, FL 32204. Citizens may drop by anytime between 4 and 6 p.m. to learn more about the s
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Florida Department of Transportation (FDOT) will host a construction open house for the Beach Boulevard (SR 212) from Southside Boulevard to Eve Drive improvements November 18 from 4-6 p.m. The in-person meeting will be held at the FDOT Urban Office Training Center located at 2198 Edison Avenue, Jacksonville, FL 32204. Citizens may drop by anytime between 4 and 6 p.m. to learn more about the scope of the project and it's impacts to the surrounding area. No formal presentation will be given as part of the meeting. To attend the meeting virtually, register for the GoTo Webinar click here Call in at (914) 614-3221 and enter the access code: 613-305-230. Proposed improvements include: Construction of a signal-controlled Median U-Turn Intersection (MUT) on eastbound Beach Boulevard to northbound Southside Boulevard Construction of a signal-controlled Median U-Turn Intersection (MUT) on westbound Beach Boulevard to southbound Southside Boulevard Construction of a stop-controlled median directional crossover on Beach Boulevard to Newell Boulevard Construction of a signal-controlled median directional crossover on Beach Boulevard to W. Eve Drive Widening Beach Boulevard to accommodate the MUTs and directional crossovers Construction of traffic signals, pedestrian and bicycle facilities and driveway modifications Installation of overhead and post-mounted signs and pavement markings Milling and resurfacing within the project limits A.M. Peak Comparison (Animation) P.M. Peak Comparison (Animation) Video |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
