logo
ProjectClosed

Beach Grading at Wallis Sands State Park

Closed · New Hampshire · Last reported Apr 2024

Source: Dodge USA

Over the course of the winter, sand from Wallis Sands has been redistributed by wave action so that large volumes of sand have been moved towards the low tide and high tide line exposing the concrete seawall that runs the length of the beach. This project involves re-grading the sand from the low tide line towards the seawall and stair ways, over the length of the Beach. The start date for the Pro

Status
Closed
Sector
Commercial, Cement, Car parking, Automotive, Manufacturing (Industrial)
Location
Rye, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Beach Grading at Wallis Sands State Park

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Beach Grading at Wallis Sands State Park” is an infrastructure initiative in the Commercial sector, located in Rye, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Over the course of the winter, sand from Wallis Sands has been redistributed by wave action so that large volumes of sand have been moved towards the low tide and high tide line exposing the concrete seawall that runs the length of the beach. This project involves re-grading the sand from the low tide line towards the seawall and stair ways, over the length of the Beach. The start date for the Project will be no earlier than April 15, 2024 and the completion date will be no later than 12:00 p...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Rye

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Cement, Car parking, Automotive, Manufacturing (Industrial)

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project