logo

Beach Lake Creek Bridge Replacement

Sector: Cement • Location: Berlin Township, Pennsylvania, United States

Source: The River Reporter

Project
Planned

The Beach Lake Creek bridge project involves replacing a temporary twin-pipe bridge with a permanent concrete box-culvert bridge. Construction is set to begin in the summer of 2026 and will last approximately six months, with funding provided by the state.

Status
Prospective
Sector
Cement, Bridge, Road
Location
Berlin Township, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
The River Reporter

ConstructChat

Ask ConstructChat about Beach Lake Creek Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Beach Lake Creek Bridge Replacement” is an infrastructure initiative in the Cement sector, located in Berlin Township, Pennsylvania, United States. Taiyo aggregates data on it from The River Reporter.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Beach Lake Creek bridge project involves replacing a temporary twin-pipe bridge with a permanent concrete box-culvert bridge. Construction is set to begin in the summer of 2026 and will last approximately six months, with funding provided by the state.

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Berlin Township

Source

Source

The River Reporter

URL

More Details

Record type

Project

Sector

Cement, Bridge, Road

Article published date

2025-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project