Beach Trail Extension
Sector: Water Supply and Storage • Location: Duluth, Minnesota, United States of America
Source: Dodge USA
Scope: This work provides for the new constructin of the BrightonBeach Trail Extension from MnDOT T.H. 61 to MSAS 185 Congdon Boulevard to Scenic 61. The work includesgrading, aggregate base, bituminous surfacing and drainage
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial
- Location
- Duluth, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Beach Trail Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope: This work provides for the new constructin of the BrightonBeach Trail Extension from MnDOT T.H. 61 to MSAS 185 Congdon Boulevard to Scenic 61. The work includesgrading, aggregate base, bituminous surfacing and drainage |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Duluth |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
