Beachwalk Building
One of 10,000+ projects Taiyo tracks in South Carolina.
Source: Dodge USA
SHIPYARD/ BEACHWALK U 138/ REPLACE BATHROOM VANITY AND SHOWER. REMOVE POPCORN TEXTURE CEILING, NEW TILE ON BATHROOM FLOOR, AND PAINT. PLUMBING. WILL UPDATE SMOKE DETECTORS.
- Status
- Under Construction
- Sector
- Commercial, Seaport, Residential, Manufacturing (Industrial)
- Location
- Hilton Head Island, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Beachwalk Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SHIPYARD/ BEACHWALK U 138/ REPLACE BATHROOM VANITY AND SHOWER. REMOVE POPCORN TEXTURE CEILING, NEW TILE ON BATHROOM FLOOR, AND PAINT. PLUMBING. WILL UPDATE SMOKE DETECTORS. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Hilton Head Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Seaport, Residential, Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
