Beacon at Glisan
Sector: Commercial • Location: Portland, Oregon, United States of America
Source: Dodge USA
Phase two, the smaller building is for permanent supportive housing, noted in the plans as "PSH Building" and will house (41) residential units on the upper three floors with community room, resident services, commercial kitchen, and amenity spaces on the ground floor. The structure is 4 levels of wood-framed construction on top of concrete slab
- Status
- Closed
- Sector
- Commercial, Cement, Residential, Manufacturing (Industrial)
- Location
- Portland, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Beacon at Glisan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase two, the smaller building is for permanent supportive housing, noted in the plans as "PSH Building" and will house (41) residential units on the upper three floors with community room, resident services, commercial kitchen, and amenity spaces on the ground floor. The structure is 4 levels of wood-framed construction on top of concrete slab |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Portland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Residential, Manufacturing (Industrial) |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
