Beacon High School Reconstruction
Sector: Power Generation (CCGT) • Location: Beacon, New York, United States of America
Source: Dodge
Beacon High School Reconstruction Separate Bids are requested for the Prime Contracts for: Mechanical Work MC and Electrical Work EC in accordance with the Drawings, Project Manual including Conditions of the Contract and Specifications This Project Includes Renovation Of Approximately 3,752 Sf Of Mechanical Space On The First Floor Of Beacon High School. Existing Exterior Chillers, Interior Boile
- Status
- Closed
- Sector
- Power Generation (CCGT), Education, Government, Manufacturing (Industrial), Commercial
- Location
- Beacon, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Beacon High School Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Beacon High School Reconstruction Separate Bids are requested for the Prime Contracts for: Mechanical Work MC and Electrical Work EC in accordance with the Drawings, Project Manual including Conditions of the Contract and Specifications This Project Includes Renovation Of Approximately 3,752 Sf Of Mechanical Space On The First Floor Of Beacon High School. Existing Exterior Chillers, Interior Boilers, And Pumps Are At The End Of Their Useful Life. These Will Be Replaced With New Air Cooled Chi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Beacon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Education, Government, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
