logo

Beacon Point AI Data Center Campus Phase 1

Sector: Power Transmission • Location: Nueces County, Texas, United States

Source: PR Newswire

Project
Under Construction

The first phase of the 1 GW Beacon Point AI Data Center Campus in Nueces County, Texas, commercialized through a 15-year lease for 352 MW of IT capacity. The campus is designed to support AI training and inference workloads at hyperscale, engineered to NVIDIA's DSX reference architecture for gigawatt-scale AI infrastructure. The project includes a triple-net lease with a high-investment-grade tena

Status
Under Construction
Sector
Power Transmission, Power Generation (CCGT), Data Center
Location
Nueces County, Texas, United States of America
Updated
22 Jul 2026
Source
PR Newswire

ConstructChat

Ask ConstructChat about Beacon Point AI Data Center Campus Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Beacon Point AI Data Center Campus Phase 1” is an infrastructure initiative in the Power Transmission sector, located in Nueces County, Texas, United States. Taiyo aggregates data on it from PR Newswire.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The first phase of the 1 GW Beacon Point AI Data Center Campus in Nueces County, Texas, commercialized through a 15-year lease for 352 MW of IT capacity. The campus is designed to support AI training and inference workloads at hyperscale, engineered to NVIDIA's DSX reference architecture for gigawatt-scale AI infrastructure. The project includes a triple-net lease with a high-investment-grade tenant and is part of a larger campus designed for up to 1,000 MW of utility capacity with initial energization expected in Q1 2027.

Original sector

Energy & Natural Resources

Budget

Location

Country

United States of America (USA)

State

Texas

City

Nueces County

Source

Source

PR Newswire

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Data Center

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project