logo

Beacon Point AI Data Center Campus Phase 1

Sector: Power Generation (CCGT) • Location: United States

Source: Dailyhunt

Project
Under Construction

Hut 8 commercialized the first phase of its Beacon Point AI data center campus through a 15-year lease for 352 megawatts of IT capacity with a confidential, high-investment-grade tenant. The project is designed around Nvidia's DSX reference architecture and supported by American Electric Power, Vertiv Holdings Co., and Jacobs. The tenant will deploy dedicated compute infrastructure for AI training

Status
Under Construction
Sector
Power Generation (CCGT), Data Center
Location
United States of America
Updated
22 Jul 2026
Source
Dailyhunt

ConstructChat

Ask ConstructChat about Beacon Point AI Data Center Campus Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Beacon Point AI Data Center Campus Phase 1” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United States. Taiyo aggregates data on it from Dailyhunt.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Hut 8 commercialized the first phase of its Beacon Point AI data center campus through a 15-year lease for 352 megawatts of IT capacity with a confidential, high-investment-grade tenant. The project is designed around Nvidia's DSX reference architecture and supported by American Electric Power, Vertiv Holdings Co., and Jacobs. The tenant will deploy dedicated compute infrastructure for AI training and inference workloads.

Original sector

Data Center

Budget

Location

Country

United States of America (USA)

Source

Source

Dailyhunt

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project