logo
ProjectApproved

Beacon Power Services Nigeria Limited

Sector: Waste Processing and Treatment • Location: Nigeria

Source: European Bank for Reconstruction and Development (EBRD)

Provision of a senior corporate loan of up to USD 10 million to Beacon Power Services Nigeria Limited ("BPSN") and Beacon Power Services Corporation ("BPS") to scale up operations and deploy technical solutions to six of Nigeria's eleven distribution companies ("DisCos"). The financing will support investments in and operation of smart metering equipment for electricity utilities enabling optimal

Status
Prospective
Sector
Waste Processing and Treatment, Power Generation (CCGT), Warehouse, Commercial, Power Transmission, Residential
Location
Nigeria
Updated
19 Nov 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Beacon Power Services Nigeria Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Beacon Power Services Nigeria Limited” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Nigeria. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Provision of a senior corporate loan of up to USD 10 million to Beacon Power Services Nigeria Limited ("BPSN") and Beacon Power Services Corporation ("BPS") to scale up operations and deploy technical solutions to six of Nigeria's eleven distribution companies ("DisCos"). The financing will support investments in and operation of smart metering equipment for electricity utilities enabling optimal use of BPS's software solutions (the "Project"). Nigeria's distribution sector has been experiencing challenges and BPS's technologies is addressing these challenges by reducing electricity losses and improving revenue collection through technology solutions. Total Project cost is estimated at USD 20 million, with USD 7.5 million co-financed through a parallel loan facility and the remainder through equity contributions.

Original sector

Energy

Budget

Location

Country

Nigeria

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Power Generation (CCGT), Warehouse, Commercial, Power Transmission, Residential

Article published date

2026-07-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project