Beacon Wind Transmission System
Sector: Power Generation (CCGT) • Location: Queens, New York, United States
Source: OffshoreWIND.biz
BP has withdrawn the application for the transmission system that would connect its Beacon Wind offshore wind project, planned to be built off New York, to the grid on land. The application was submitted in 2022 and concerned the transmission infrastructure running from New York State territorial waters to a grid connection point at the Astoria Power Complex in Queens.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Cancelled |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | BP has withdrawn the application for the transmission system that would connect its Beacon Wind offshore wind project, planned to be built off New York, to the grid on land. The application was submitted in 2022 and concerned the transmission infrastructure running from New York State territorial waters to a grid connection point at the Astoria Power Complex in Queens. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
