logo

Beale AFB Common Mission Control Center

Sector: Car parking • Location: United States of America (USA)

Source: Walsh

Project
Completed

This is a Design-Bid-Build project to construct a new 83,000-square-foot, two-story Common Mission Control Center. Project includes utilities, fire detection/suppression system, intrusion alarms, special secure and controlled infrastructure (multi-network, reliability/redundancy criteria), pavements, site improvements, landscaping, communications and parking. Additionally, this project included a

Project Information FAQ

Project Information

5 Q
The project “Beale AFB Common Mission Control Center” is an infrastructure initiative in the Car parking sector, located in United States of America (USA). Taiyo aggregates data on it from Walsh.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This is a Design-Bid-Build project to construct a new 83,000-square-foot, two-story Common Mission Control Center. Project includes utilities, fire detection/suppression system, intrusion alarms, special secure and controlled infrastructure (multi-network, reliability/redundancy criteria), pavements, site improvements, landscaping, communications and parking. Additionally, this project included a new 12 MVA electrical substation and supporting infrastructure. This project complies with DoD Antiterrorism / Force Protection and Sensitive Compartmented Information Facility requirements per the Unified Facility Criteria. The constructed 5,600-square-foot server room has redundant cooling back-up, full UPS power back-up for the server room and operating systems, and 2.4 megawatts of generator back-up. Due to the nature of the mission the building was highly secure with CCTV monitoring of the entire facility.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data