Bear Branch Pump Station Upgrades Phase II
Sector: Waste Processing and Treatment • Location: Perry, Georgia, United States of America
Source: Dodge
Cleaning and relining of the two (2) existing wet wells. Removal of existing packaged pump station. Installation of new packaged suction lift pump station, suction and discharge piping, and associated electrical and instrumentation and controls improvements. Connect discharge piping to existing force main. Remove and replace emergency bypass connection. Install generator to provide backup power to
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Perry, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bear Branch Pump Station Upgrades Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cleaning and relining of the two (2) existing wet wells. Removal of existing packaged pump station. Installation of new packaged suction lift pump station, suction and discharge piping, and associated electrical and instrumentation and controls improvements. Connect discharge piping to existing force main. Remove and replace emergency bypass connection. Install generator to provide backup power to the pump station. Install new 4-inch water service line. Connect to existing water service line.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Perry |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
