logo

Bear Creek Parkway Bridge Erosion Protection

Sector: Government • Location: Keller, Texas, United States of America

Source: Dodge

Project
Closed

This Project consists of: 1. 204 SY of 6 Concrete Riprap. 2. 269 SY of 48 Pier Protection Riprap (24 Diameter Stone). 3. 819 SY of 24 Bank Stabilization Riprap (18 Diameter Stone). 4. 641 CY of grading Excavation.

Status
Closed
Sector
Government, Cement, Road, Commercial, Bridge
Location
Keller, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Bear Creek Parkway Bridge Erosion Protection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bear Creek Parkway Bridge Erosion Protection” is an infrastructure initiative in the Government sector, located in Keller, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This Project consists of: 1. 204 SY of 6 Concrete Riprap. 2. 269 SY of 48 Pier Protection Riprap (24 Diameter Stone). 3. 819 SY of 24 Bank Stabilization Riprap (18 Diameter Stone). 4. 641 CY of grading Excavation.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Keller

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Cement, Road, Commercial, Bridge

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project