logo
ProjectClosed

Bear River Phase 3 Water System

Closed · Nova Scotia · Last reported May 2024

Source: Dodge USA

100mm dia. PVC DR18. Connect to new Water Main, Connect to existing Service, Water Service Pipe, Curb stop. Self Draining Yard Hydrant. Pre-insulated Bridge Crossing Pipe 100mm Dia. DI cl. 52. 100mm dia. DI Pipe Cl. 52. 100mm PVC Sanitary Service

Status
Closed
Sector
Bridge, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
Annapolis Royal, Nova Scotia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bear River Phase 3 Water System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bear River Phase 3 Water System” is an infrastructure initiative in the Bridge sector, located in Annapolis Royal, Nova Scotia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

100mm dia. PVC DR18. Connect to new Water Main, Connect to existing Service, Water Service Pipe, Curb stop. Self Draining Yard Hydrant. Pre-insulated Bridge Crossing Pipe 100mm Dia. DI cl. 52. 100mm dia. DI Pipe Cl. 52. 100mm PVC Sanitary Service

Procurement method

Budget

Location

Country

Canada

State

Nova Scotia

City

Annapolis Royal

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project