Bear Road Cr 191 2r Paving Project
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge USA
This project is located in the Town of Clay and involves improvements to Bear Road from Sandy Lane to NYS Route 11 (1.2 miles). The work involves milling and overlaying existing asphalt pavement. Sidewalk, curb, and drainage improvements are also included in the work.
- Status
- Closed
- Sector
- Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Automotive, Commercial
- Location
- Clay, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bear Road Cr 191 2r Paving Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is located in the Town of Clay and involves improvements to Bear Road from Sandy Lane to NYS Route 11 (1.2 miles). The work involves milling and overlaying existing asphalt pavement. Sidewalk, curb, and drainage improvements are also included in the work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Clay |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
