Bear Valley School Building Improvements
Closed · California · Last reported Jun 2025
Source: Dodge
The project consists of remodel of two restrooms, installation of a new platform lift and partial demo/re-building of a snow tunnel entry at Bear Valley School, as shown on the Drawings and as indicated in the Specifications.A remodel of the domestic plumbing system as generally delineated on the plumbing drawings, including service piping and final connections to equipment furnished and installed
- Status
- Closed
- Sector
- Power Generation (CCGT), Tunnel, Education, Government, Commercial
- Location
- Arnold, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bear Valley School Building Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of remodel of two restrooms, installation of a new platform lift and partial demo/re-building of a snow tunnel entry at Bear Valley School, as shown on the Drawings and as indicated in the Specifications.A remodel of the domestic plumbing system as generally delineated on the plumbing drawings, including service piping and final connections to equipment furnished and installed by other trades as may be shown on the architectural, electrical or other drawings of the contra... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Arnold |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Tunnel, Education, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
