logo
ProjectClosed

Bear Valley School Building Improvements

Closed · California · Last reported Jun 2025

Source: Dodge

The project consists of remodel of two restrooms, installation of a new platform lift and partial demo/re-building of a snow tunnel entry at Bear Valley School, as shown on the Drawings and as indicated in the Specifications.A remodel of the domestic plumbing system as generally delineated on the plumbing drawings, including service piping and final connections to equipment furnished and installed

Status
Closed
Sector
Power Generation (CCGT), Tunnel, Education, Government, Commercial
Location
Arnold, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Bear Valley School Building Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bear Valley School Building Improvements” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Arnold, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of remodel of two restrooms, installation of a new platform lift and partial demo/re-building of a snow tunnel entry at Bear Valley School, as shown on the Drawings and as indicated in the Specifications.A remodel of the domestic plumbing system as generally delineated on the plumbing drawings, including service piping and final connections to equipment furnished and installed by other trades as may be shown on the architectural, electrical or other drawings of the contra...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Arnold

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Tunnel, Education, Government, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project