logo

Beardslee Repaving Project

Sector: Power Transmission • Location: United State of America (USA)

Source: Cascadia College

Project
Unknown

The City of Bothell will be conducting utility work and repaving on Beardslee between 185th and 110th. This location is along the entire frontage of Husky Hall. The work will commence in July and be substantially complete in late September. The construction work include replacement of utilities 17 feet underground and once the utilities are replaced the entire width of Beardslee will be repaved. A

Project Information FAQ

Project Information

2 Q
The project “Beardslee Repaving Project” is an infrastructure initiative in the Power Transmission sector, located in United State of America (USA). Taiyo aggregates data on it from Cascadia College.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The City of Bothell will be conducting utility work and repaving on Beardslee between 185th and 110th. This location is along the entire frontage of Husky Hall. The work will commence in July and be substantially complete in late September. The construction work include replacement of utilities 17 feet underground and once the utilities are replaced the entire width of Beardslee will be repaved. As a result of the construction, Beardslee will only have one lane open eastbound. We are working with the City and our internal team to assess the myriad issues such as access to Husky Village, access to Husky Hall, cut through traffic on campus, bus rerouting, orientation days, summer camps and more. Watch for additional information about this project and its impacts in June.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data