Beaver Creek Hybrid Solar and Storage Project
Sector: Energy Storage • Location: Georgia, United States
Source: Solarbytes
The Beaver Creek hybrid project in Baldwin County, Georgia combines 229 MW of solar generation with 183 MWh of battery energy storage capacity. It has a 20-year power purchase agreement with Georgia Power covering 100% of its output. The project is expected to generate approximately 400 GWh annually, with commercial operations starting in Q3 2028 and the PPA commencing in May 2029.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Solar, Commercial
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Solarbytes
ConstructChat
Ask ConstructChat about Beaver Creek Hybrid Solar and Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Beaver Creek hybrid project in Baldwin County, Georgia combines 229 MW of solar generation with 183 MWh of battery energy storage capacity. It has a 20-year power purchase agreement with Georgia Power covering 100% of its output. The project is expected to generate approximately 400 GWh annually, with commercial operations starting in Q3 2028 and the PPA commencing in May 2029. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Solarbytes |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar, Commercial |
Article published date | 2026-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States
- Tampa Bay Seawater Desalination Plant
- Centrally Managed Pay-and-Display Parking
- Chevron Richmond Refinery
- Nestle Food and Distribution Centre, USA
- Pepperidge Farm Bakery Plant
- Baldock Solar Highway
- Doyle Drive Replacement / Presidio Parkway, San Francisco, US
- Newtown Creek (35-G) North and North Central Batteries
