logo

Beaver Creek Rock Weirs Modification

Sector: Commercial • Location: United States of America

Source: Grants.gov

Project
Archived

As part of meeting commitments in the Federal Columbia River Power System (FCRPs) Biological Opinions (BiOps), Reclamation provided technical assistance to OCD for the design of fish passage improvements (weirs) at six irrigation diversions as part of the collaborative efforts in Beaver Creek. Significant flood flows occurred in the spring 2011 as a result of above average precipitation and was f

Project Information FAQ

Project Information

5 Q
The project “Beaver Creek Rock Weirs Modification” is an infrastructure initiative in the Commercial sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

As part of meeting commitments in the Federal Columbia River Power System (FCRPs) Biological Opinions (BiOps), Reclamation provided technical assistance to OCD for the design of fish passage improvements (weirs) at six irrigation diversions as part of the collaborative efforts in Beaver Creek. Significant flood flows occurred in the spring 2011 as a result of above average precipitation and was further acerbated by fires which burned more than half the upper basin of Beaver Creek in 2006. Now, three of the weirs (Fort Thurlow, Thurlow Transfer, and Marracci) do not presently meet the design criteria for providing fish passage at all flows, and must be reconstructed. Due to factors beyond MSRFs control an extension of time and additional funding is needed. Delays and cost increases arose because Reclamation engineers have had difficulties in finalizing a preferred design that satisfies the challenging nature of the project site, is agreeable to landowners and irrigators, and that meets Washington Department of Fish and Wildlife fish passage criteria. The land owner for Thurlow Transfer has opted out of this project, therefore leaving only two weirs. The need to complete the reconstruction of these two weirs is mostly about assuring that irrigators are able to make their appropriated water right withdrawals without having to work in the river to create a push up dam or other method of diverting water that would have significant impact to native endangered fish species.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data