Beaver Dam Trail Over Fishing Brook Bridge Replacement
Sector: Water Supply and Storage • Location: Old Saybrook, Connecticut, United States of America
Source: Dodge USA
Replacement of Bridge No. 105003, Beaver Dam Trail Over Fishing Brook, Old Saybrook, CT The Project primarily consists of removal of an existing metal pipe culvert and replacement with a precast concrete rigid frame.
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Car parking, Automotive, Commercial, Government, Hydro, Metal, Cement, Waste Processing and Treatment, Bridge
- Location
- Old Saybrook, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Beaver Dam Trail Over Fishing Brook Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of Bridge No. 105003, Beaver Dam Trail Over Fishing Brook, Old Saybrook, CT The Project primarily consists of removal of an existing metal pipe culvert and replacement with a precast concrete rigid frame. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Old Saybrook |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Car parking, Automotive, Commercial, Government, Hydro, Metal, Cement, Waste Processing and Treatment, Bridge |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
