logo
ProjectUnder Construction

Beaver River Bridge Replacement Project

One of 10,000+ projects Taiyo tracks in Pennsylvania.

Source: PA Turnpike

This project involves the reconstruction and widening of two miles of the Pennsylvania Turnpike from milepost 12 to milepost 14 in North Sewickley Township, Homewood Borough, and Big Beaver Borough, Beaver County. The roadway will be widened from four lanes to six, including three 12-foot-wide travel lanes in each direction, a 26-foot median, and 12-foot-wide shoulders. The project includes the co

Status
Under Construction
Sector
Bridge, Road, Power Transmission, Power Generation (CCGT), Government
Location
North Sewickley Township, Homewood Borough, Big Beaver Borough, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
PA Turnpike

ConstructChat

Ask ConstructChat about Beaver River Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Beaver River Bridge Replacement Project” is an infrastructure initiative in the Bridge sector, located in North Sewickley Township, Homewood Borough, Big Beaver Borough, Pennsylvania, United States. Taiyo aggregates data on it from PA Turnpike.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves the reconstruction and widening of two miles of the Pennsylvania Turnpike from milepost 12 to milepost 14 in North Sewickley Township, Homewood Borough, and Big Beaver Borough, Beaver County. The roadway will be widened from four lanes to six, including three 12-foot-wide travel lanes in each direction, a 26-foot median, and 12-foot-wide shoulders. The project includes the complete replacement of the mainline bridge over the Beaver River (WB-211, Milepost 13.21), shifting the mainline to the north to realign with the new bridge and avoid environmental and utility issues. The existing interchange will be reconfigured into a conventional interchange with SR 0018. The Beaver River mainline bridge replacement is currently under construction, with construction of the mainline roadway and bridges in progress, expected to be completed by December 2027. Upon completion, the project will enhance safety and mobility for travelers on this section of the interstate.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Pennsylvania

City

North Sewickley Township, Homewood Borough, Big Beaver Borough

Source

Source

PA Turnpike

URL

More Details

Record type

Project

Sector

Bridge, Road, Power Transmission, Power Generation (CCGT), Government

Article published date

2025-12-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project