logo
ProjectPlanning Schematics

Becker Dock

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

removal of an existing, previously permitted, 448 sq. ft. dock and an unpermitted 112 sq. ft. attached float/finger; and the installation of a new 793 sq. ft. dock.

Status
Prospective
Sector
Manufacturing (Industrial), Commercial
Location
Leavenworth, Washington, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Becker Dock

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Becker Dock” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Leavenworth, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

removal of an existing, previously permitted, 448 sq. ft. dock and an unpermitted 112 sq. ft. attached float/finger; and the installation of a new 793 sq. ft. dock.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Leavenworth

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project