logo

Bedugul Geothermal Power Plant

Active · Bali

Source: World Bank Group

Project
Active

In April of 2004, local private company, Bali Energy Limited, in collaboration with the state oil company, PT Pertamina, took over the management of a geothermal power plant project located in Bedugul, Bali, which was suspended by the Indonesian government in 1997 following the regional financial crisis. The project was expected to produce 10-MW of energy by April 2006, while subsequent phases of

Status
Prospective
Sector
Commercial, Geothermal, Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Bali, Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bedugul Geothermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bedugul Geothermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Bali, Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In April of 2004, local private company, Bali Energy Limited, in collaboration with the state oil company, PT Pertamina, took over the management of a geothermal power plant project located in Bedugul, Bali, which was suspended by the Indonesian government in 1997 following the regional financial crisis. The project was expected to produce 10-MW of energy by April 2006, while subsequent phases of the project were scheduled to produce an additional 55 MW by June 2008; 55 MW more by June 2009; and another 55 MW by June of 2010. Once the plant came into operation, the power was to be sold to the state-owned electric company PT Perusahaan Listrik Negara (PLN). US$46.7 million had already been invested in the project before it was suspended, covering the cost of geophysical surveys, test drilling, and infrastructure creation. The 30 year production lease was to begin following the actual commencement of commercial operations, with a 4% profit share payable to the government and a 34% share for Pertamina. The balance of any profits was to go to Bali Energy Limited. None None

Original sector

Energy

Location

Country

Indonesia

State

Bali

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project