logo

Beijing Subway Line 14 Part B

Sector: Mass Transit • Location: China

Source: World Bank Group

Project
Active

In November 2012, Beijing MTR Corporation Limited a joint venture of the Hong Kong based MTR Corporation (49% share) and two Beijing SOEs (Beijing Infrastructure Investment Company Limited 25%; Beijing Capital Group 49%) was granted the concession agreement to build and operate the Beijing Subway Line 14. The line had a length of 47.3 KM and the total investment was US$ 8.06452 billion (RMB 50 bil

Project Information FAQ

Project Information

4 Q
The project “Beijing Subway Line 14 Part B” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In November 2012, Beijing MTR Corporation Limited a joint venture of the Hong Kong based MTR Corporation (49% share) and two Beijing SOEs (Beijing Infrastructure Investment Company Limited 25%; Beijing Capital Group 49%) was granted the concession agreement to build and operate the Beijing Subway Line 14. The line had a length of 47.3 KM and the total investment was US$ 8.06452 billion (RMB 50 billion). The project was split into part A and B. Part A, the civil works would be financed and implemented by an SOE Beijing Subway Line 14 Investment Company Limited. Beijing MTR Corporation Limited would finance and implement Part B covering the vehicle, signal and mechanical systems for US$ 2.41935 billion (RMB 15 billion). US$ 2.23452 billion (RMB 13.854 billion) construction was completed by February 2013. Construction of the works actually commenced in April 2010. The west section of the line, 12.4km long, came into operation in May 2013. Beijing MTR Corporation would operate the project for 30 years. The concession agreement was officially signed in November 2014. In January 2015, the whole line was still not through. There were 6 stations and the lines in between with a total length of 6km which were still not opened to the public, so only the east and west sections of the Line were operational. MTR actually has a 49% stake only in the MB 15 billion Part B of Line 14, which account for 30% of the whole project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data