Beirut Critical Environment Recovery, Restoration and Waste Management Program
Sector: Water Supply and Storage • Location: Lebanon
Source: World Bank Group
The development objective of Critical Environment Recovery, Restoration and Waste Management Program is to support immediate environment control measures from the impacts of August 2020 Port of Beirut explosion and planning for longer term environmental restoration efforts in Beirut City. This project has three components. 1) The first component, . Rehabilitation of damaged solid waste management
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Biomass, Waste Processing and Treatment, Government
- Location
- Lebanon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Beirut Critical Environment Recovery, Restoration and Waste Management Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of Critical Environment Recovery, Restoration and Waste Management Program is to support immediate environment control measures from the impacts of August 2020 Port of Beirut explosion and planning for longer term environmental restoration efforts in Beirut City. This project has three components. 1) The first component, . Rehabilitation of damaged solid waste management infrastructure and management of asbestos-contaminated debris generated due to PoB explosion, has the following sub-components: (i) Management of asbestos-contaminated debris generated in the explosion affected areas of Beirut; (ii) Rehabilitation of severely damaged solid waste management facilities serving Beirut area; and (iii) Piloting ISWM in the selected explosion impacted areas of Beirut. 2) The second component, Policy and institutional support for greening Beirut Reconstruction Agenda, has the following sub-components: (i) Establishment of a collaborative platform for stakeholder engagement and planning priority actions for greening Beirut’s reconstruction agenda; and (ii) Strengthening monitoring and enforcement for the management of critical hazardous and chemical substances. 3) The third component, Project Management, aims to support project management activities to be carried out by United Nations Development Programme (UNDP) as an Intermediary Implementing Agency (IIA). |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Lebanon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Biomass, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Lebanon
- Rehabilitation of Metn water supply systems- Prepare/ update detailed studies and tender documents
- Preparation of detailed engineering design for Majdlaya and El Fouar villages drinking water project
- Preparation of Tender Documents for the Construction of the Works in Eastern Zahle Area and Western Bekaa and Rachaya Areas
- Master plan study for the treatment and disposal of sludge residues from wastewater treatment plants
- Cleaning of waste water and rain water networks in Beirut Southern suberbs: Technical Assistance and supervision
- Tebbaneh storm water networks-Supervision
- Preparation of a Feasibility Study for East Zahle Region Wastewater Project
- Feasibility study of West Bekaa water supply systems - Bekaa Water Supply Rehabilitation and Modernization project
