Beitel Creek Greenway - Perrin Homestead to LBJ Park
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project involves the expansion of a 1.48-mile-long, 10-foot-wide concrete trail as part of the Howard W. Peak Greenway Trails System, specifically, the Salado Creek Greenway extension. This segment will connect Perrin Homestead to Lady Bird Johnson Park (LBJ), linking the existing sidewalk at Perrin Homestead to the established trailhead at LBJ Park. Excavation, grading and installation of a
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Car parking, Fertilizers, Automotive, Manufacturing (Industrial), Road, Raw Materials, Waste Processing and Treatment, Commercial
- Location
- San Antonio, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Beitel Creek Greenway - Perrin Homestead to LBJ Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the expansion of a 1.48-mile-long, 10-foot-wide concrete trail as part of the Howard W. Peak Greenway Trails System, specifically, the Salado Creek Greenway extension. This segment will connect Perrin Homestead to Lady Bird Johnson Park (LBJ), linking the existing sidewalk at Perrin Homestead to the established trailhead at LBJ Park. Excavation, grading and installation of a 10-foot-wide concrete trail with 24 toe downs, limestone riprap, and elevated boardwalks with lim... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Antonio |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Car parking, Fertilizers, Automotive, Manufacturing (Industrial), Road, Raw Materials, Waste Processing and Treatment, Commercial |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
