logo
ProjectClosed

Bekasi Landfill Gas Flaring

One of 10,000+ projects Taiyo tracks in Indonesia.

Source: World Bank Group

The Bekasi Landfill Gas Recovery Project for Indonesia development objective is to collect and flare methane produced from solid waste disposed in the City of Bekasi's Tempat Pembuangan Akhir (TPA) Sumur Batu landfill and thus reduce greenhouse gases (GHG) emissions. This objective will be facilitated through a Carbon Finance transaction between the World Bank and the project developer. In additio

Status
Closed
Sector
Water Supply and Storage, Biomass, Natural Gas, Waste Processing and Treatment, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bekasi Landfill Gas Flaring

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bekasi Landfill Gas Flaring” is an infrastructure initiative in the Water Supply and Storage sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Bekasi Landfill Gas Recovery Project for Indonesia development objective is to collect and flare methane produced from solid waste disposed in the City of Bekasi's Tempat Pembuangan Akhir (TPA) Sumur Batu landfill and thus reduce greenhouse gases (GHG) emissions. This objective will be facilitated through a Carbon Finance transaction between the World Bank and the project developer. In addition, a percentage of the project developer's revenues from the certified emission reductions (CERs) will be shared with the city to help improve solid waste collection and disposal within the municipality resulting in various public health benefits. Moreover, implementation of this carbon finance operation (CFO) can also act as a catalyst for the development of similar clean development mechanism (CDM) projects in the municipal solid waste sector, benefiting not only reductions of global GHG emissions, but improvements to solid waste collection and disposal throughout Indonesia. This CFO consists of two distinct project activities: (i) the construction and operation of landfill gas (LFG) collection and flaring equipment that will result in CERs; and (ii) a Carbon Finance transaction that will facilitate the purchase of the CERs. The first activity will consist of LFG extraction and flaring facilities that will include the following components: (i) a collection system consisting of horizontal and vertical wells and collection pipes that will be installed in the area containing waste that will be expanded over time as additional areas of the landfill are filled; (ii) LFG pumping equipment including a pipeline and blowers; (iii) LFG treatment and flare systems which will remove moisture and combust the gas; and (iv) monitoring and control systems. The second activity are World Bank-managed the Netherlands clean development facility (NCDMF) will finance the purchase of CER credits resulting from the LFG flaring component. The design of the landfill gas component was significantly influenced by the attempt to optimize the amount of CERs to be delivered and purchased through this transaction.

Original sector

FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Natural Gas, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project