logo

Bekasi Water Project

Sector: Water Supply and Storage • Location: Indonesia

Source: World Bank Group

Project
Active

Indonesia's Bekasi Regency and PT Moya Indonesia, a wholly owned subsidiary of Moya Asia Ltd, a subsidiary of the Bahrain-based closed joint stock company Moya Holding Company signed a 25-year contract in August 2011 to design build own operate and transfer a fresh water treatment complex.

The contract has been the first PPP contract awarded through direct negotiation. The project falls under a

Project Information FAQ

Project Information

5 Q
The project “Bekasi Water Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Indonesia's Bekasi Regency and PT Moya Indonesia, a wholly owned subsidiary of Moya Asia Ltd, a subsidiary of the Bahrain-based closed joint stock company Moya Holding Company signed a 25-year contract in August 2011 to design build own operate and transfer a fresh water treatment complex. The contract has been the first PPP contract awarded through direct negotiation. The project falls under a clause of the PPP regulations introduced in Indonesia that allow local water companies to directly contract with a private enterprise to operate an existing facility under what is known as a business-to-business (B2B) contract. The project entailed two phases. The first phase entailed the construction of a new production unit that will supply 17,280 m3/day as well as upgrading the existing unit to supply 43,200 m3/day. After the first phase is completed, the total production of the complex should reach 60,480 m3/day. The second phase would further increase the capacity to 86,400 m3/day. The second phase was expected to be completed by 2017. The project company, PT Moya Bekasi was owned by PT Moya Indonesia (95%) and by PT Bekasi Jaya (5%), a development and investment company owned by the local Bekasi Regency government. According to PT Moya Indonesia the costs of the project (estimated at US$15-20 million) were to be covered by the company's internal sources. The first water treatment unit was inaugurated on September 30,2012 and it produces 19,008 m3/day (220 liters per second) Sources: http://www.moyaasia.com/investor/press_release.php http://www.globalwaterintel.com/archive/12/9/general/moya-takes-direct-approach.html Sponsor = Moya Asia needs to be included in the sponsor list

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data