logo

Bekasi Water Project

Sector: Commercial • Location: West Java, Indonesia

Source: World Bank Group

Project
Active

Indonesia's Bekasi Regency and PT Moya Indonesia, a wholly owned subsidiary of Moya Asia Ltd, a subsidiary of the Bahrain-based closed joint stock company Moya Holding Company signed a 25-year contract in August 2011 to design build own operate and transfer a fresh water treatment complex.

The contract has been the first PPP contract awarded through direct negotiation. The project falls under a

Status
Prospective
Sector
Commercial, Water Supply and Storage, Government, Waste Processing and Treatment
Location
West Java, Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bekasi Water Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bekasi Water Project” is an infrastructure initiative in the Commercial sector, located in West Java, Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Indonesia's Bekasi Regency and PT Moya Indonesia, a wholly owned subsidiary of Moya Asia Ltd, a subsidiary of the Bahrain-based closed joint stock company Moya Holding Company signed a 25-year contract in August 2011 to design build own operate and transfer a fresh water treatment complex. The contract has been the first PPP contract awarded through direct negotiation. The project falls under a clause of the PPP regulations introduced in Indonesia that allow local water companies to directly contract with a private enterprise to operate an existing facility under what is known as a business-to-business (B2B) contract. The project entailed two phases. The first phase entailed the construction of a new production unit that will supply 17,280 m3/day as well as upgrading the existing unit to supply 43,200 m3/day. After the first phase is completed, the total production of the complex should reach 60,480 m3/day. The second phase would further increase the capacity to 86,400 m3/day. The second phase was expected to be completed by 2017. The project company, PT Moya Bekasi was owned by PT Moya Indonesia (95%) and by PT Bekasi Jaya (5%), a development and investment company owned by the local Bekasi Regency government. According to PT Moya Indonesia the costs of the project (estimated at US$15-20 million) were to be covered by the company's internal sources. The first water treatment unit was inaugurated on September 30,2012 and it produces 19,008 m3/day (220 liters per second) Sources: http://www.moyaasia.com/investor/press_release.php http://www.globalwaterintel.com/archive/12/9/general/moya-takes-direct-approach.html Sponsor = Moya Asia needs to be included in the sponsor list

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

Indonesia

State

West Java

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Government, Waste Processing and Treatment

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project