Bel Air Boulevard Relocation Phase II
Sector: Water Supply and Storage • Location: Sherman, Texas, United States of America
Source: Dodge USA
Phase II consists of relocating existing groundwater line to follow the creek, with new pressure vault at FM 1417. Additionally, the phase includes a new 20-inch surface water line. Phase II stops at US 75.
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Commercial, Government
- Location
- Sherman, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bel Air Boulevard Relocation Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Phase II consists of relocating existing groundwater line to follow the creek, with new pressure vault at FM 1417. Additionally, the phase includes a new 20-inch surface water line. Phase II stops at US 75. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Sherman |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Commercial, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
