Belchatow II
One of 10,000+ projects Taiyo tracks in Poland.
Source: European Bank for Reconstruction and Development (EBRD)
A sovereign-guaranteed loan of up to EUR 70 million to the Republika Srpska Motorways (RSM). The loan will be used to finance the construction of a 6.1 km motorway section between Interchange Rudanka (Kostajnica) to Interchange Johovac (Tovira), plus around 1 km of a two lane road connection to the existing trunk road, including a crossing of the River Bosna. This would be the first 6 km out of to
- Status
- Closed
- Sector
- Road, Residential, Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Belchatow II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A sovereign-guaranteed loan of up to EUR 70 million to the Republika Srpska Motorways (RSM). The loan will be used to finance the construction of a 6.1 km motorway section between Interchange Rudanka (Kostajnica) to Interchange Johovac (Tovira), plus around 1 km of a two lane road connection to the existing trunk road, including a crossing of the River Bosna. This would be the first 6 km out of total 46.6 km of Corridor Vc that needs to be constructed within Republika Srpska (RS) territory. This section is part of the international Corridor Vc and will be built to full motorway standards with dual carriageway. Corridor Vc is part of the Western Balkans Core Network and has been established as an indicative extension of the Trans-European Transport Networks (TEN-T). Corridor Vc is the key motorway which connects BiH to EU markets in the north and the Port of Ploce on the Adriatic coast in Croatia in the south. The Project will facilitate BiH’s internal and regional integration by improving its key transport infrastructure. The Project will assist the company to improve its sound business practices by obtaining certification from the Chartered Institute of Procurement and Supply (CIPS) and obtaining Quality Management System ISO 9001. Environmental Impact Assessment: Serbian | English EIA Serbian annexes: 1-2 | 3 | 4 Non technical summary: Serbian | English Stakeholder Engagement Plan: Serbian | English Land Acquisition and Livelihood Restoration Framework: Serbian | English Biodiversity Screening: Serbian | English Environmental and Social Action Plan: Serbian | English Full ESIA documentation is available locally at: Client website Documents: Serbian | English City of Doboj Hilandarska 1, 74 000 Doboj Tel: +387 53 242 022 www.opstina-doboj.ba And EBRD, BiH 15th Floor, Tower B Unitic Towers Fra Andela Zvizdovica 1 71000 Sarajevo, Bosnia and Herzegovina http://www.ebrd.com/ebrd-in-bosnia-and-herzegovina.html Environmental or social enquiries Ms. Dobrila Majstorovic, Public Relations Republika Srpska Motorways Address: Vase Pelagica 10, 78000, Banja Luka Tel: +387 51 233 670 E-mail: info@autoputevirs.com |
Original sector | Energy |
Location
Country | Poland |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Residential, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Golice Wind Park
- Design and build of 18.2 km on the S19 highway between Dukla and Barwinek (Poland)
- Design and construction of 18.1 km of the S19 highway between Radzyn and Podlaski (Poland)
- Design and construction of the third section of the A2 over 12 km in the Mińsk Mazowiecki bypass (Poland)
- Cadbury Schweppes Confectionery Factory, Skarbimierz
- Design and construction of 17 km of S3 express road Swinoujscie-Tronszyn in the section between Swinoulscie-Dargobadz (Poland)
- Design and construction of 19.46 km of the S-61 highway between Prodborze and Sniadowo (Poland)
- Design and construction of 6,67 km of the S-7 highway between Plotnisko and Lesznowola (Poland)
