Beldon Tunnel No. 2
Sector: Tunnel • Location: California, United States of America (USA)
Source: Mitchell Construction
Project consisted of drilling 50’ holes in 2 stages and subsequent grouting to create a grout curtain around the tunnel. Added work included: a) Reparation of cracked surface areas by chipping out loose material, forming and grouting, and b) Removal of 650’ of an original 8” slick line along the crown of the tunnel to make room for a PVC membrane liner.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Project consisted of drilling 50’ holes in 2 stages and subsequent grouting to create a grout curtain around the tunnel. Added work included: a) Reparation of cracked surface areas by chipping out loose material, forming and grouting, and b) Removal of 650’ of an original 8” slick line along the crown of the tunnel to make room for a PVC membrane liner. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Tunnel projects in United States of America (USA)
- Pappajohn Biomedical Discovery Building
- Woodall Rodgers Deck Park
- Frederick Douglass Tunnel Program
- CPMC California Pacific Medical Center
- Construct alterations and additions of a retaining wall and access tunnel to an existing commercial building, per plan. (scope of work is extension of work under permit record 6805872-PH)
- San José to Merced
- C2303-01 Rebuild Cooling Tower, Bldg 7-Women's Eastern Reception, Diagnostic, & Correctional Center
- Fort Randall Dam, Lake Francis Case, SD - Dam Safety-Clean and rehab Radial Drains of the Penstock Tunnels
