logo

Belgaum Wind Farm

Sector: Biomass • Location: India

Source: World Bank Group

Project
Active

In 2008, Belgaum Wind Farms Private (BWFPL), a subsidiary of UK based Indian Energy Limited (IEL), undertook the development of 24.8 Megawatt (MW) wind power plant at Gadag district in Karnataka. The project would feed 56 million kwh of electricity to the Karnataka state grid.

In India, the regulatory commission of respective states has separate policies for procurement of power generated from

Status
Prospective
Sector
Biomass, Wind, Raw Materials, Power Generation (CCGT), Government, Automotive, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Belgaum Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Belgaum Wind Farm” is an infrastructure initiative in the Biomass sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 2008, Belgaum Wind Farms Private (BWFPL), a subsidiary of UK based Indian Energy Limited (IEL), undertook the development of 24.8 Megawatt (MW) wind power plant at Gadag district in Karnataka. The project would feed 56 million kwh of electricity to the Karnataka state grid. In India, the regulatory commission of respective states has separate policies for procurement of power generated from renewable sources. Under these regulations, the project proponent enters into long-term power purchase agreements (PPAs) with electricity distribution companies for the power produced by them. In India, the regulatory commission of respective states has issued Renewable Purchase Specification (RPS) under which all the State Electricity Boards (SEBs) and/or Distribution Companies (Discoms) have to purchase a minimum quantum of power from renewable sources like wind, biomass, co-generation etc., this minimum percentage varies from state to state and is in the range of 3 to 5 per cent for northern states and 4 to 7 per cent in western states. BWFPL, the special purpose vehicle was formed in March 2007 to execute the project. IEL holds 100% equity in the SPV The wind farm will be spread over nine villages (Kurtkoti, Harti, Kanavi etc.) in the district of Gadag. The projects will comprise of 31 turbines of 0.8 mw each. Enercon India is EPC contractor for the project. The total cost of the generation project was estimated at US$ 33.49 million. The project reached financial closure in September 2008 with a debt equity ratio of 1.7:1. Debt was a single 12.5-year term loan lead arranged by State Bank of India. Construction works began in 2008 and the project was expected to be commissioned 2011.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Wind, Raw Materials, Power Generation (CCGT), Government, Automotive, Commercial

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project