logo
ProjectProposed

Belgrade Waste Management

Sector: Biomass • Location: Serbia

Source: Multilateral Investment Guarentee Agency (MIGA)

Project Description On October 1, 2019, MIGA issued guarantees of €97.16 million to cover equity investments by Suez Groupe of France (Suez), Luxembourg-based Marguerite Waste Serbia S.à r.l. (“Marguerite”), and UK-based I-Environment Investments Ltd - a wholly-owned subsidiary of Itochu Corporation of Japan (Itochu) - into the project enterprise Beo Čista Energija d.o.o. incorporated in the Repu

Status
Prospective
Sector
Biomass, Commercial, Government, Natural Gas, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial)
Location
Serbia
Updated
19 Nov 2026
Source
Multilateral Investment Guarentee Agency (MIGA)

ConstructChat

Ask ConstructChat about Belgrade Waste Management

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Belgrade Waste Management” is an infrastructure initiative in the Biomass sector, located in Serbia. Taiyo aggregates data on it from Multilateral Investment Guarentee Agency (MIGA).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Project Description On October 1, 2019, MIGA issued guarantees of €97.16 million to cover equity investments by Suez Groupe of France (Suez), Luxembourg-based Marguerite Waste Serbia S.à r.l. (“Marguerite”), and UK-based I-Environment Investments Ltd - a wholly-owned subsidiary of Itochu Corporation of Japan (Itochu) - into the project enterprise Beo Čista Energija d.o.o. incorporated in the Republic of Serbia. The proposed Project includes construction and operation of a new waste management facility with electricity and heat generation components in Belgrade, Serbia with an estimated project cost of up to €373 million (the “Project”). The guarantee holders have each applied for guarantees of up to €39.64 million, €17.88 million, and €39.64 million, respectively, for their equity investments into the Project. The guarantees will have a term of up to 20 years, providing coverage against non-commercial risks, including Breach of Contract. Environmental Categorization The Project has been classified as Category A according to the MIGA Policy on Environmental and Social Sustainability. Click here to view the Environmental and Social Review Summary prepared by the International Finance Corporation for their investment into the Project. Development Impact The proposed Project is expected to generate the following benefits: (i) climate change, by reducing GHG emissions; (ii) environment, by closing the existing landfill, which has been reported as having hazardous environment impacts, and diverting improperly disposed waste; (iii) public sector management, by reducing the burden on the City of Belgrade for the processing of municipal waste, thereby freeing up landfill capacity, which has been reported as limited. The Project carries also the potential for having demonstration effect, as first sizeable PPP in waste-energy in the Balkans, and for displacing fossil fuel-based electricity capacity, the majority of which is now lignite-fired.

Original sector

Solid Waste Management

Procurement method

Budget

Location

Country

Serbia

Source

Source reliability

High

Source

Multilateral Investment Guarentee Agency (MIGA)

URL

More Details

Record type

Project

Sector

Biomass, Commercial, Government, Natural Gas, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial)

Article published date

2023-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project