Belinchón Solar PV Portfolio
Sector: Solar • Location: Cuenca, Castilla-La Mancha, Spain
Source: PV Tech
Zelestra has started commercial operations at three solar PV plants—Belinchón I, II and III—with a combined capacity of 162MW in Cuenca, Castilla-La Mancha, Spain. The plants were delivered within 14 months, with Zelestra overseeing engineering, procurement and construction (EPC). Around 275,000 solar modules were installed across the three sites, mounted on single-axis trackers to maximise genera
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Commercial
- Location
- Cuenca, Castilla-La Mancha, Spain
- Updated
- 22 Jul 2026
- Source
- PV Tech
ConstructChat
Ask ConstructChat about Belinchón Solar PV Portfolio
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Zelestra has started commercial operations at three solar PV plants—Belinchón I, II and III—with a combined capacity of 162MW in Cuenca, Castilla-La Mancha, Spain. The plants were delivered within 14 months, with Zelestra overseeing engineering, procurement and construction (EPC). Around 275,000 solar modules were installed across the three sites, mounted on single-axis trackers to maximise generation. |
Original sector | Energy |
Location
Country | Spain |
State | Castilla-La Mancha |
City | Cuenca |
Source
Source | PV Tech |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Commercial |
Article published date | 2026-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
