Belize Co-generation Energy Limited
Sector: Commercial • Location: Belize
Source: World Bank Group
Belize Co-generation Energy Limited (Belcogen) was developing a 31.5 MW, partially captive, bagasse-fired cogeneration plant. Belcogen had a 15-year power purchase agreement with Belize Electricity Limited (BEL). Under the PPA, due to commence in mid-2009, Belcogen was to make 14 MW of capacity available to the offtaker. The remainder of the capacity was to be made available to the sugar refinery
- Status
- Prospective
- Sector
- Commercial, Oil and Gas, Consumer Products, Manufacturing (Industrial), Power Generation (CCGT), Government
- Location
- Belize
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Belize Co-generation Energy Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Belize Co-generation Energy Limited (Belcogen) was developing a 31.5 MW, partially captive, bagasse-fired cogeneration plant. Belcogen had a 15-year power purchase agreement with Belize Electricity Limited (BEL). Under the PPA, due to commence in mid-2009, Belcogen was to make 14 MW of capacity available to the offtaker. The remainder of the capacity was to be made available to the sugar refinery owned by the project sponsor, Belize Sugar Industries (BSI). The greenfield project was to be developed on a build, own and operate basis. The plant was located within BSI’s Tower Hill compound, near Orange Walk town in northern Belize. The project was intended to expand the national electricity supply in Belize, and was expected to amount to 20% of total generation capacity in the country. The US$62 million project reached financial closure on March 15, 2007, with the conclusion of a US$35.25 million loan agreement between Belize Sugar Industries and a consortium of multilaterals and development banks. The consortium included Inter American Development Bank (US$8.8 million), Caribbean Development Bank (US$8.8 million), Netherlands Development Finance Company [FMO] (US$8.8 million) and Corporacion Interamericana para el Financiamiento de Infraestructura (CIFI). Belize Sugar Industries was expected to contribute US$26.75 million in equity financing. In March 2007, Belcogen announced that it had awarded an engineering, procurement and construction (EPC) contract to Chinese engineering firm, SFECO. Construction commenced during 2008 and the plant was expected to be fully commercially operational by the end of 2009. In December 2009 the plant became operational. |
Original sector | Energy |
Budget |
Location
Country | Belize |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Oil and Gas, Consumer Products, Manufacturing (Industrial), Power Generation (CCGT), Government |
Article published date | 2024-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
