logo

Belize Co-generation Energy Limited

Sector: Commercial • Location: Belize

Source: World Bank Group

Project
Active

Belize Co-generation Energy Limited (Belcogen) was developing a 31.5 MW, partially captive, bagasse-fired cogeneration plant. Belcogen had a 15-year power purchase agreement with Belize Electricity Limited (BEL). Under the PPA, due to commence in mid-2009, Belcogen was to make 14 MW of capacity available to the offtaker. The remainder of the capacity was to be made available to the sugar refinery

Status
Prospective
Sector
Commercial, Oil and Gas, Consumer Products, Manufacturing (Industrial), Power Generation (CCGT), Government
Location
Belize
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Belize Co-generation Energy Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Belize Co-generation Energy Limited” is an infrastructure initiative in the Commercial sector, located in Belize. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Belize Co-generation Energy Limited (Belcogen) was developing a 31.5 MW, partially captive, bagasse-fired cogeneration plant. Belcogen had a 15-year power purchase agreement with Belize Electricity Limited (BEL). Under the PPA, due to commence in mid-2009, Belcogen was to make 14 MW of capacity available to the offtaker. The remainder of the capacity was to be made available to the sugar refinery owned by the project sponsor, Belize Sugar Industries (BSI). The greenfield project was to be developed on a build, own and operate basis. The plant was located within BSI’s Tower Hill compound, near Orange Walk town in northern Belize. The project was intended to expand the national electricity supply in Belize, and was expected to amount to 20% of total generation capacity in the country. The US$62 million project reached financial closure on March 15, 2007, with the conclusion of a US$35.25 million loan agreement between Belize Sugar Industries and a consortium of multilaterals and development banks. The consortium included Inter American Development Bank (US$8.8 million), Caribbean Development Bank (US$8.8 million), Netherlands Development Finance Company [FMO] (US$8.8 million) and Corporacion Interamericana para el Financiamiento de Infraestructura (CIFI). Belize Sugar Industries was expected to contribute US$26.75 million in equity financing. In March 2007, Belcogen announced that it had awarded an engineering, procurement and construction (EPC) contract to Chinese engineering firm, SFECO. Construction commenced during 2008 and the plant was expected to be fully commercially operational by the end of 2009. In December 2009 the plant became operational.

Original sector

Energy

Budget

Location

Country

Belize

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Oil and Gas, Consumer Products, Manufacturing (Industrial), Power Generation (CCGT), Government

Article published date

2024-06-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project